Boiler Blowdown Procedure on Ships

Boiler Blowdown Procedure on Ships

Introduction

Boiler blowdown refers to the process that takes place on board ships to remove dissolved salts, sludge and other impurities from the water in boilers. This process is crucial to maintaining the correct chemistry of the water, preventing scale buildup and ensuring the proper functioning of the boiler. Blowdown is performed periodically, depending on the test results of the boiler water and the operating conditions of the boiler.

What is Boiler Blowdown?

Boiler blowdown is the controlled discharge of boiler water from the boiler system to reduce the concentration of dissolved and suspended impurities.

As water is converted into steam, most dissolved solids remain inside the boiler. With continuous steam production, their concentration gradually increases. Blowdown helps keep these concentrations within the limits specified by the boiler water treatment programme.

There are generally two types of blowdown:

  • Continuous blowdown: 

A small quantity of boiler water is discharged continuously or at regular intervals to control dissolved solids.

  • Intermittent or bottom blowdown: 

A larger quantity of water is discharged for a short period from the lower part of the boiler to remove sludge and settled impurities.

Why is Boiler Blowdown Important?

Regular blowdown is necessary for several reasons:

  • Controls the concentration of dissolved salts in boiler water
  • Removes sludge and suspended impurities
  • Helps prevent scale formation on heating surfaces
  • Reduces the possibility of corrosion
  • Controls foaming and priming
  • Helps maintain good steam quality
  • Improves boiler reliability and operating efficiency

Table of Contents

Boiler Blowdown Procedure on Ship

The exact procedure varies depending on the boiler design and shipboard arrangement. The manufacturer’s instructions and the vessel’s operating procedures should always be followed.

  • Check Boiler Water Conditions

Before carrying out blowdown, check the boiler water test results and operating conditions. Parameters such as chloride level, phosphate, alkalinity, pH and conductivity may be monitored according to the vessel’s water treatment programme.

Determine whether continuous or intermittent blowdown is required.

  • Inform the Engine Room Personnel

Blowdown should be carried out with proper communication between the personnel involved. If necessary, inform the duty engineer or other engine room personnel before opening the blowdown valve.

Make sure the discharge arrangement is ready and that no maintenance work is being carried out on the blowdown system.

  • Check the Blowdown Line

Inspect the blowdown valve, piping and associated equipment for any visible leakage or abnormal condition.

The blowdown line should be connected to the designated blowdown tank, drain tank or other approved discharge arrangement. Never discharge boiler water into an unsuitable location.

  • Confirm the Boiler Operating Condition

Check the boiler pressure and water level before starting. The boiler should be operating within its normal parameters.

For bottom blowdown, the water level and boiler pressure should be carefully monitored because a sudden discharge can cause a noticeable change in boiler water conditions.

  • Open the Blowdown Valve Gradually

Open the valve slowly according to the ship’s approved procedure. Sudden opening can cause rapid flow, water hammer or excessive stress on the piping and valves.

During the operation, observe the blowdown line and associated equipment for abnormal vibration, leakage or unusual noise.

  • Carry Out the Blowdown for the Required Duration

The duration and frequency depend on the boiler design, boiler water test results and operating conditions.

For intermittent bottom blowdown, the valve is normally opened for a short controlled period and then closed securely. The operation should remove accumulated sludge without unnecessarily discharging a large amount of boiler water.

Continuous blowdown may be adjusted using the designated valve or control system to maintain the required water chemistry.

  • Close the Valve Properly

After the required blowdown has been completed, close the blowdown valve as instructed by the manufacturer’s procedure.

Check that the valve is fully closed and that there is no leakage from the valve, flange or piping.

  • Check Boiler Water Level and Pressure

After blowdown, monitor the boiler water level and pressure. If necessary, make adjustments using the normal feed water system.

Avoid making sudden changes to boiler operating conditions. Continue monitoring until the boiler returns to stable operation.

  • Record the Operation

The blowdown operation should be recorded as required by the vessel’s procedures. Details may include the date, time, boiler condition, duration of blowdown and relevant boiler water test results.

These records help engineers monitor trends in boiler water quality and determine whether the blowdown frequency needs adjustment.

Safety Precautions During Boiler Blowdown

Safety Precautions During Boiler Blowdown

Common Problems Caused by Improper Blowdown

Insufficient blowdown can result in excessive dissolved solids, sludge, scale, foaming and poor steam quality. On the other hand, excessive blowdown can lead to unnecessary heat loss, chemical wastage and increased feed water consumption.

Therefore, blowdown should not simply be performed for a fixed duration without considering boiler water test results and operating conditions.

Conclusion

Boiler blowdown is a relatively simple but critical process on board ships. It helps to ensure the quality of the water in the boiler and protect it from the formation of scale and corrosion as well as impurities. Thus, it is important to carry out blowdowns at the right time and in the right proportion, taking into account test results, boiler characteristics and manufacturer recommendations.

Frequently Asked Questions (FAQs)

It is done to remove concentrated boiler water, dissolved materials, and sludges.

It is a short periodic blowdown made from the lower part of the boiler.

It depends on the results of water analysis, boiler design, boiler operating conditions and manufacturer’s recommendations.

There is wastage of hot treated water, chemicals and heat and consequently poor efficiency.

To avoid high pressure differences leading to water hammer and extra strain on the blowdown piping and valves.

Disclaimer :- The opinions expressed in this article belong solely to the author and may not necessarily reflect those of Merchant Navy Decoded. We cannot guarantee the accuracy of the information provided and disclaim any responsibility for it. Data and visuals used are sourced from publicly available information and may not be authenticated by any regulatory body. Reviews and comments appearing on our blogs represent the opinions of individuals and do not necessarily reflect the views of Merchant Navy Decoded. We are not responsible for any loss or damage resulting from reliance on these reviews or comments.

Reproduction, copying, sharing, or use of the article or images in any form is strictly prohibited without prior permission from both the author and Merchant Navy Decoded.

DIWALI SALE

Decoded Discount Alert! up to 50% OFF

DIWALI SALE

Decoded Discount Alert! up to 50% OFF

Use Coupon Code Deep50

Days
Hours
Seconds
0
Would love your thoughts, please comment.x
()
x